Advanced Refresher- personnel with the authority and responsibility
for making decisions on the specific MOT/TTC requirements to be
implemented. These positions include the following: * The
Professional Engineer responsible for the development of the
Transportation Management Plan (TMP) and design of the MOT/TTC Plan *
The Worksite Traffic Supervisor in accordance with FDOT Standard
Specifications, Section 102 * Personnel responsible for supervising
the installation, removal and field maintenance of MOT/TTC devices,
including temporary barriers, end treatments and crash cushions *
Personnel responsible for inspection of the placement or
operational function of temporary traffic control devices, including
temporary barriers, end treatments and crash cushions
art
281
Views
25/02/2020 Last update