For the privilege of using the camp, we are required to provide 100 person-hours of service each spring to ready the camp for the summer. Our assignment for this year is: Replace hay bales on Archery Range, Clear limbs/branches/trees for chipping, run chipper, clear and repair camp trails, spread chips on trails. Equipment needed: Wheelbarrows, lopers, shovels, chainsaw, rakes, gloves, P/U trucks, small dump trailers (if possible). Meet at the camp at 9:00. If we gather at least 25 people and work for 4 hours, we've done our part.